After the successful conversion of the upper parts back in 2008 we were instructed to return to remodel the retail areas.  Although already a successful business it was evident that the unit could be dramatically improved due to wasted storage areas that were valuable trading floor space.  We carried out a laser survey and set to work on the proposals, working alongside our preferred structural engineers we devised a plan that was cost effective and scheduled to be completed within a short 8 week time frame!